The International Energy Agency’s November World Energy Outlook puts data-center electricity use at just under 500 TWh in 2025, about 1.7% of worldwide demand. The agency’s analysis points to a possible doubling by 2030 as AI accounts for a growing share of consumption.
The report identifies constraints on both sides of the meter. Rising waits for transformers and gas turbines can push out energization dates, while memory supply can limit how quickly operators install computing equipment. A small number of large campus delays could materially change the demand trajectory.